December 4, 2022 - December 10, 2022The Weston Department of Public Works continued to fulfill its mission to construct and maintain the physical infrastructure that provides for the public's health and safety, to protect the environment, and to enhance the quality of life and ensure that Weston continues to be a desirable place in which to live and conduct business. The following is the weekly report, by division:
|
|
|
|
2022 Roadway Reconstruction ProgramUtility work needs to be appropriately coordinated and completed, the following roads are expected to be worked on this construction season. Also note the gas main work being completed by National Grid in the utility work section below:
Round 2 (July/August/September timeframe) - Willard Road – drainage work needed prior to reconstruction – anticipate work being started next construction season;
- Bemis Road – Drainage work needed prior to reconstruction – anticipate work being started next construction season;
Round 3 (we are anticipating that this round of paving will occur next construction season) - Bittersweet Road;
- Chiltern Road;
- Dean Road;
- Ferndale Road;
- Old Colony Road;
- Columbine Road.
On the radar depending on how the season goes: - Hickory Road – drainage work (crossings) first;
- Briar Lane;
- Walnut Road (public section);
Road Cutting after Paving Moratorium Once paving is completed on any roadway in Weston, a five-year moratorium on pavement cutting is placed on that road. This is done to protect the investment made by taxpayers. A five-year schedule of anticipated roadway reconstruction is available on the DPW's web page under Capital Improvement Projects. Town Center Improvement Project Ongoing Work
Outstanding work –Replacement trees have been completed and remaining punchlist items ongoing.
|
|
|
|
State/Utility Project Work- Continuing to coordinate with Eversource on a number of outstanding issues in Town including double poles, poles guyed into trees, leaning poles and poles guyed with rope, Hazard trees at/near power lines, etc.;
- National Grid has submitted several permits for repairing long-standing gas leak locations;
- Eversource is conducting tree work (pruning and removals) on several streets in the middle/south section of Town starting along Route 20 to Love Lane to Highland Street to Pine Street, etc…anticipate crews being in Town for several weeks noting that they are currently in town.
National Grid Gas Relay Projects:- Church Street – (at/about Pigeon Hill Road) Work completed with the exception of the crossing over the MBTA/Rail Trail – Draft of revised proposal of bridge crossing provided to DPW for review and comments
- Winter Street (Brown to Radcliffe Road) – Select Board grant of location held on 3/8/22 and GOL approved that evening with conditions. Ngrid is indicating will be pushed to next construction season.
Wellesley Street (649 to Glen Road) – Gas main and service work completed…..Final Trench Paving work will occur next Spring (2023);Glen Road (from Oxbow to Wellesley Town Line) – Pavement Marking still outstanding.- There may be additional gas main replacement work later in the 2022 Construction Season, but the NGrid designs are not yet completed.
- Whitney Tavern – DPW has received engineered plans;
- Overlook Drive – DPW has received engineered plans;
- Stillmeadow Road – Work ongoing. Gas main replacement completed. New gas main charged. Crew will be working on the six service replacements needed over the next 2 weeks.
- Irving Road – DPW has received engineered plans;
- Westcliff Road – Contractor has started test pitting for new gas main replacement;
- It is anticipated that approximately 19810 LF or 3.75 miles plus of gas main will be replaced during the 2022 Construction Season.
Merriam Street Bridge over the MBTA (owned and maintained by MassDOT)Town is attempting to work with MassDOT on more permanent solution to bridge carrying capacity. MassDOT has requested that the Town be invited to a bridge consultant scoping session. The MassDOT expeditors were aware of the comments from the DPW (Cullen) to the State Bridge Engineer. Additional items discussed were potential detour routes, hours of operations including nightwork during critical bridge erection tasks, Water/Other Utilities including lighting fixtures, guardrail at the approaches and bridge railings, lighting, etc. We also encouraged the State about holding a pre-25% discussion with the Town prior to the design public hearing, a “neighborhood meeting”. Eversource Utility Pole and Infrastructure Upgrades on 117/North Ave & Winter Street (from Natick Town line to just north of Bogle Street)Eversource crew indicated that all their overhead infrastructure is completed and the remaining work is the transfers for others ( Crown Castle, Verizon, Comcast and Town Fiber). The remaining double poles can be removed. MassDOT Newton-Weston bridge replacements and rehabilitations at I-90/I-95 – Visit MassDOT website for project information.
|
|
|
|
Ongoing DPW Projects & Consultant Work Drainage and Culvert- Southside Drainage – Phase III – design and permitting work completed. Neighborhood meeting occurred with one (1) participant. Next action items are affirming easement rights. Anticipate project startup Spring 2023 assuming Engineering can finalize all necessary easements;
- Overseeing consultant design and permitting for Concord Road Culvert replacement, which has impacts on the Warren Avenue and Merriam Street culverts - decision matrix tabling being evaluated. Engineering presented findings to Select Board and the Conservation Commission.
- Sherburn Circle Culvert replacement – Construction ongoing. Final Paving work completed…..Anticipate work continuing through early December 2022 (railing installation). Plantings will be deferred until next construction season (Spring 2023). Anticipate opening the roadway to thru traffic the end of December 12th week.
State TIP (Overseeing Consultant Work On) - Proposed Route 30 Roadway Reconstruction TIP Project (roadway, sidewalk, drainage improvements, intersection improvements, etc.) - approval of 25% plan submission was approved by the Board at a September 24, 2020 meeting. Formal 25% Submission to MassDOT October 2020. MassDOT 25% Design Public Hearing which was held on September 22, 2022 at 6:30 pm (Virtual). Town working towards getting this project included in the TIP which is programed for FY 2026 in the MPO plan; Project info at https://www.westonma.gov/1274/Route-30-Reconstruction;
- Proposed Route 20 Intersection Improvement TIP Project - (signal at Boston Post Road/Wellesley Street/Boston Post Road By-Pass) - Project info at weston.org. Next action item: addressing comments received at the Public Hearing and then submission of 75% Highway Submission. Town will continue to work towards getting this project included in the TIP which is programed for FY 2026 in the MPO plan. Project info at https://www.westonma.gov/727/Route-20-Intersection-Improvement
- Proposed Intersection Improvements at Highland Street and Route 20 (potential TIP Project) – Town Engineer and Traffic and Sidewalk Committee working with consultant on data gather aspect of this proposed project.
SidewalkAsh Street Sidewalk Project – Failed to pass at Town Meeting.- Warren Avenue – Funding secured for the work; culvert replacement and drainage work needs to take place; sidewalk project needs to be coordinated with roadway work. Warren Avenue sidewalk project has been shelved due to varying opinions on the design of the sidewalk and placement.
- Conant Road (from Church Street to 155 Conant Road) – This is the proposed FY 2023 Sidewalk Resurfacing project. Activity with Engineering Division to determine accessibility related issues before resurfacing will be undertaken.
Additional- Wireless Meter Reading - See Weston.org/WaterMeters for more project information.
- Resident Notices for Meter Upgrades: June 18th. First letters send out to Cycle #1 (north section of town);
- GPS coordinates collected on all current infrastructure installations;
- Three remaining Collector Antenna sites prepped for installations – work completed;
- Meter Upgrades at DPW completed and operating on new system – Approximately 70% operational (2553 customers). Meter supply shortage the issue…currently taking in excess of 4 months to get an order of water meters.
- Paines Hill Tank Replacement Design – Zoning By-Law change did not pass at May 2022 Town Meeting. Preliminary work started for Article 97 process including survey, deed research, etc. Project Info. and other information concerning water distribution system: https://www.westonma.gov/1743/Water-System-Master-Plan-Upgrades-Replac
- Coordinating with Developer on Park Road and Recreation Road Development – Including but not limited to roadway modifications on Park Road which is in the permitting phase, water main replacement/upgrade which is completed (but not internal to the site).
- Coordinating with Public Tree RFP – Participate in process relating to public tree RFP thru the Town Planner’s office. Contract is being managed by the Town Planner.
- MWRA Metropolitan Water Tunnel Program – Participating in update meetings with the MWRA and its consultant as they work towards the Draft Environmental Impact Report (DEIR) which is anticipated in the October / November 2022 timeframe. DPW Director has provided some preliminary comments and/or concerns. Anticipate that after the DEIR is published that the MWRA will provide a presentation to the Select Board. Visit the MWRA website for more information: https://www.mwra.com/mwtp/program.html
- I-90 / I -95 (Route 218) Bridge Replacement projects – Scheduled Design Public Hearing (virtual) on 8/18/22. Visit MassDOT website for hearing information: https://www.mass.gov/info-details/about-the-newton-weston-bridge-replacement-and-rehabilitation-at-i-90i-95
- Route 128/I-95 Land Use & Transportation Study – Visit MassDOT website for information: https://www.mass.gov/route-128i-95-study
|
|
|
|
Engineering Division- Currently reviewing 8 Stormwater Permits;
- Approved 36 projects currently under construction;
- MS4 Stormwater Permit Annual Report –
MS4-Permit Annual Report for Year 4 (FY 2022) of the MS4 Permit; the Annual Report for Year 4 is completed;- Some new Public educational and outreach messages prepared for the fall season to be posted on line and mailed out. Some of the older messages can be reused also as they include typical information about maintaining stormwater quality. The messages for the Fall include typical information about proper disposal of leaves, composting, and cleaning and maintaining drainage infrastructure.
- The town’s MS4 Permit consultant is working the first phase of the Phosphorous Control Plan will be completed this current fiscal year, Year 5 of the MS4 Permit. Phosphorous is a concern in the environment, especially in water ways and stormwater, so there are continuous requirements in the MS4 permit for communities to reduce the phosphorous in stormwater.
- Working with the Town’s Traffic and Sidewalk Committee on several items: Chestnut Street, Sunset Road, stop sign requests, sidewalk requests, crosswalk requests, etc.;
- Engineering Drainage Designs Ongoing / Construction Bid Documents advertised:
- Rolling Lane – Work ongoing….anticipate completing week of Dec. 12th. Director had requested that the paving work at Route 20 and Rolling Lane be addressed by MassDOT’s contractor that installed drainage infrastructure to address an ongoing puddle/icing condition at intersection.
- 520 Glen Road – Drainage construction anticipated for 2022;
- Ash Street – drainage design in progress;
- Winter Street – Culverts and drainage conditions investigated;
- Hickory Road – Multiple drainage pipes to be replaced. And 1-2 drainage manholes needed. Awaiting crew assignment.
|
|
|
|
|
Stormwater Education Snowmelt, just like rain runoff, is a component of the water cycle. It can carry pollutants from roads, highways, and parking lots to local waterways. This winter, use deicers smartly and sparingly. Follow product instructions and only use as much deicer as you need. More is not better. Or use a safe de-icing alternative, such as calcium magnesium acetate (CMA)
|
|
|
|
Water Division- Completed approximately 32 DigSafes;
- Performed weekly samples (3), monthly water samples at tanks, and station/tank inspections;
- Conducted 5 final read(s);
- Continued to upgrade meters and water billing;
- Meter reading underway;
- Inspected 1 water service relocation and installed new meter and valves;
- Installed new meter;
- Responded to 0 low (no water call) pressure call(s);
- Responded to 1 water quality call(s).
|
|
|
|
Park and Cemetery Division - 0 cremation interments;
- 0 grave dug with casket interments;
- Set 0 flush markers;
- Dug and poured foundation for 0 monument(s);
- Mowed Linwood Cemetery;
- Leaf cleanup in Linwood Cemetery, DPW, and Police Station;
- Assisted contractors with tree removal and pruning around town;
- Removed furniture from Town Center;
- Serviced equipment;
|
|
|
|
Solid Waste and Recycling Division- Processed 1 - 100-yard solid waste dumpster(s) totaling 25.51 tons;
- Picked up municipal office recycling – 1200 lbs;
- Picked up Town office and select town park solid waste – 1300 lbs;
- Processed 2 cardboard container – 6.54 tons;
- Processed 1 glass container – 4.40 tons;
- Processed 0 container of plastic – 0 tons;
- Processed 0 bulky plastic container – 0 lbs;
- Processed 0 newspaper container – 0 tons;
- Ran 1 shuttles for grass/leaves – 6.13 tons;
- Ran 1 shuttles for brush /logs – 4.28 tons;
- Processed 1 metal container – 4.28 tons;
- Process 0 container of scrap wood – 0 tons;
- Assisted with the pickup of various donations including clothing, electronics, books and bikes – 1.60 tons;
- Assisted with pickup of Weston textiles – 1140 lbs;
- Electronics and appliances w/Freon – 0 lbs;
- Processed the pickup of CRT electronics – 0 lbs;
- Processed 5 cent deposit bottles and cans – 0 tons;
- Processed 1 rechargeable battery pickup – 140 lbs;
- Processed pickup of medical sharps – 0 lbs;
- Processed pickup of light bulbs – 0 lbs;
- Assisted with the pick-up of propane tanks – 0 tanks (0 lbs);
- Pickup auto batteries and wire recycling – 0 lbs;
- Swap Shed open on a volunteer basis;
- Cleaned the trailer pit as needed;
- Pick up litter and cleaned up around the site as needed;
- Packed containers as needed to maximize loads;
- Disinfected Solid Waste and Recycling areas daily;
- Seasonal cleanup around the Transfer Station;
- Food Composting – 2020 lbs.
|
|
|
|
Highway/Stormwater Divisions General:- COVID-19: Personnel and Equipment SOPs;
- Respond to Misc. calls for Service – 10;
- Traffic Detours Setup & Removals: None;
- Inspect Roadway/Driveway Conditions: None;
- Employee In/Out of House Training: None;
- Cooks Pond Pump Station (drainage): Pump operating normally, 12/7. On 12/9 pump was off but got it running;
- DIGSafe Markouts & Permits Requested: None;
- Message Board: DPW;
- Deer Removal / Dead Animal Removal: 12/9 Rolling Lane;
- Cleaning and Servicing Equipment: As needed;
Outside of Division:- Assist Water Division: None;
- Assist Park/Cemetery/Transfer Station Division: leaf pickup;
- Assist Fleet Maintenance: None;
- Assist Engineering: None;
- Assist Police Department: downed tree limb calls;
- Assist Fire Department – None;
- Assist Tree Contractor with Removals – 12/5 Division List;
- Assist Paving Contractor (Lazaro) – None;
- Assist Hydroseeding Contractor: None;
- Assist Loaming Crew: None;
- Assist with/or Applying Pavement Markings: None;
- Assist Drainage & Video /Jet Cleaning Contractor: None;
- Assist Grounds/Facilities: None;
- Assist Conservation Commission – None;
- Assist Recreation Department – None;
- Assist MassDOT: None;
Assist Rubber Chip Stone Contractor: completed for the seasonAssist VMP Contractor: Completed for the season;Assist Crack Sealing Contractor: None. Completed for the season. Highway:- Inspect Roadway Conditions: Various
- Screen and Remove waste gravel material from Upper Yard: Compost Screening all week
- Sign and Mailbox Repairs and Installations and fence repairs: None;
- Assist Stormwater Division – clear waterways, clean catch basin tops;
- Pavement Markings (temp) applied and/or removed: None;
- Remove debris from roadway: tree debris;
- Skin Overlay: None;
- Pothole Patching and Trench Patching: 12/9 Pothole patching various locations;
- Wall Inspections and/or Repairs: None;
- Sidewalk & Island Leaf Cleanup: 12/5, 12/6, 12/8;
- Street Sweeping: None;
- Repair Shoulder Erosion and/or Surface Degradation: None;
- Mowing and trimming Islands and Grass Strips: None;
- Flail Mowing: None;
- Inspect Tree Locations: None;
- Tree and/or Branch Removals and Debris Cleanup: 12/6 various locations;
- Tree Canopy Raising and Trimming: None;
- Cleanup Stump Grindings, backfill with Loam and grade: None;
- Loam and Seed: None;
Stormwater:- Drain Line/Pipe Repairs: None;
- DMH/CB Inspections & Roadway ID Markings: None;
- Catch Basin Cleaning: Ongoing – None;
- Assist Highway Division: leaf pickup, compost screening, tree/limb pickup;
- Street Sweeping: None;
- Check and Clear Waterways: 12/7;
- Respond flooding calls: None;
- Jet Cleaning Drainage (DPW): None;
- Catch Basin Inspection, DMH rebuild: None;
- Install/remove Erosion Controls: None.
Winter Operations (winter is coming!) - Sand Barrels: None;
- Yard Loader for Material Storage: None;
- Deicing Operations: None
; - General Plowing: None;
- Sidewalk Plowing: None;
- Install and Prep Plow and/or Deicing Equipment: 12/7;
- Remove Plows: None;
- Snow Removal: None.
|
|
|
|
Vehicle Maintenance Division- Performed routine maintenance (fluid services, tires and brakes, exhaust, steering and suspension, exterior trim work and electrical repairs) on
- 9 school buses
- 4 police vehicle
- 10 DPW trucks and other equipment
- 0 recreation vehicles
- 1 school grounds vehicles
- noting that the DPW Vehicle Maintenance Division is responsible for over 133 pieces of rolling stock for the Town;
- Performed 2 major repair(s) on vehicles with Major/Significant maintenance activity: H-21 hydraulic leak and flat tire;
- Fuel island, weekly inspection performed;
- Fuel tanks (0) gallons gasoline delivered; (0) diesel delivered;
- Facility tanks (0) gallons pumped, waste oil (0) gallons, Waste antifreeze (0) gallons; tight tanks (0);
- Inspections: None;
- Road Call: 3 – H-21 and H-32;
- Recalls: None;
- Division Assistance: None;
- Wash Bay Maintenance: None;
- Performed 0 repairs on sanders and plows: None
|
|
|
|
Want more?Don't miss another weekly update. Easily subscribe today at www.westonma.gov/list.aspx
Comments/Suggestions: contact webmaster@westonma.gov
|
|
|
|
|
|